Sparely
DU

FAN,COOLING MOTOR,DWG.763-7690,FOR PP-13

Material 4200011371 · FAN · Plant 1000

AReorderCriticalStockout
Material
4200011371
Category
FAN
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
65 d · P80 103 d
Unit price
Rp 1.3M (est.)

Recommendation

  • 1.Forecast 1.6 EA/year: 1.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~65 days; expected demand during lead time 0.3.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 6 now.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 7.5M · order by 01 Oct 2026
Expected arrival ≈ 65 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.9%
stockout risk now 16%
Unit price
Rp 1.3M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 230 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 566.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-136B-M
MOTOR FOR PP-136B
A110.19

Lead time and procurement

Lead time 65 ± 31 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
05 May 2025MediumPX_PP-136B-MPP-136B-M bearing noise

Recent goods issues

Posting dateQtyOrderOrder type
13 Feb 20261201000035004Corrective
12 Feb 20262201000035004Corrective
12 Feb 20261201000035004Corrective
08 May 20251201000023525Corrective