FAN,COOLING MOTOR,DWG.581-6538,FOR PP-99

Material 4200011463 · FAN · Plant 1000

ALong-leadReorderCriticalStockout
Material
4200011463
Category
FAN
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
BINTANG SUPLINDO GLOBAL PT
Lead time
54 d · P80 103 d
Unit price
Rp 2.3M

Recommendation

  • 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~54 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 5 now.
  • 5.Long lead time: 80% of deliveries took up to 103 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 11.7M · order by 01 Oct 2026
Expected arrival ≈ 54 days
Long-leadConvert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 9%
Unit price
Rp 2.3M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 287 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 386.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-992B-M
MOTOR FOR PP-992B
A121.05

Lead time and procurement

Lead time 54 ± 31 days (PO history + category, 2 PO lines) · on-time 29%

PR dateTypeQtyUnit priceDeliveryLead time
06 Nov 2025PR06
Regular replenishment
1Rp 2.4M02 Dec 202526 d
28 Sept 2025PR06
Regular replenishment
2Rp 2.3M17 Nov 202550 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Aug 2025MediumPX_PP-992B-MLeak from packing
29 Jul 2025LowPX_PP-992B-MPP-992B-M bearing noise

Recent goods issues

Posting dateQtyOrderOrder type
18 Dec 20251201000004398Corrective
22 Aug 20252201000031137Corrective