FAN,COOLING MOTOR,DWG.366-6956,FOR PP-60
Material 4200011481 · FAN · Plant 1000
AReduceSlow-moving
- Material
- 4200011481
- Category
- FAN
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- PRIMA LOGAM SENTOSA PT
- Lead time
- 56 d · P80 56 d
- Unit price
- Rp 1.1M
Recommendation
- 1.Forecast 0.9 EA/year: 0.9 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~56 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.Stock 8 exceeds the level to keep (3) by 5.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Convert to Stock ItemSingle source
On hand / on order
8 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1.1M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 184 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 523.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-606D-M MOTOR FOR PP-606D | A | 1 | 3 | 1.05 |
Lead time and procurement
Lead time 56 ± 20 days (PO history, 4 PO lines) · on-time 44%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 16 Jul 2026 | PR06 Regular replenishment | 1 | Rp 1.1M | 04 Sept 2026 | 50 d |
| 28 Jun 2026 | PR06 Regular replenishment | 2 | Rp 1.1M | 09 Aug 2026 | 42 d |
| 09 Nov 2025 | PR03 Regular replenishment | 1 | Rp 1.1M | 14 Jan 2026 | 66 d |
| 10 May 2025 | PR06 Regular replenishment | 1 | Rp 1.0M | 21 Jun 2025 | 42 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 16 Jul 2026 | Medium | PX_PP-606D-M | Leak from packing |
| 16 Mar 2026 | Medium | PX_PP-606D-M | PP-606D-M high temp |
| 03 May 2025 | Medium | PX_PP-606D-M | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 31 Mar 2026 | 1 | 201000001342 | Corrective |
| 22 Dec 2025 | 1 | 201000031770 | Corrective |