Sparely
DU

DEMISTER PAD,DWG.721-5554,FOR VD-1069

Material 4300000201 · DEMISTER PAD · Plant 1000

BReduceSlow-moving
Material
4300000201
Category
DEMISTER PAD
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
99 d · P80 147 d
Unit price
Rp 15.4M (est.)

Recommendation

  • 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~99 days; expected demand during lead time 0.2.
  • 3.A 98.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 110 exceeds the level to keep (2) by 108.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
110 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
98.8%
stockout risk now 0%
Unit price
Rp 15.4M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 108.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~34 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_VD-1069
PROPYLENE DRUM
B151.79

Lead time and procurement

Lead time 99 ± 59 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
01 Aug 2026MediumPX_VD-1069VD-1069 level glass broken
19 Apr 2026MediumPX_VD-1069Replace lamp as per PM finding
15 Dec 2025MediumPX_VD-1069Inspect VD-1069
05 Oct 2025LowPX_VD-1069VD-1069 level glass broken
30 May 2025MediumPX_VD-1069Inspect VD-1069

Recent goods issues

Posting dateQtyOrderOrder type
18 May 20251204000017830Preventive