Sparely
DU

BLADE,ROTOR,DWG.726-8864,FOR KT-202

Material 4300000389 · BLADE · Plant 1000

SReduceExcess
Material
4300000389
Category
BLADE
Base unit
SET
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
RAJAWALI REFRAKTORI PRATAMA PT
Lead time
181 d · P80 263 d
Unit price
Rp 189.3M

Recommendation

  • 1.Forecast 2.4 SET/year: 2.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~181 days; expected demand during lead time 1.2.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 10 exceeds the level to keep (0) by 10.
Single sourceOpen POLead time estimated
On hand / on order
10 / 1
next delivery 17 Oct 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 189.3M
PO history
ML early warning: 18% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 87 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~99 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-202
TURBINE FOR KC-202
S142.81

Lead time and procurement

Lead time 181 ± 109 days (Category estimate, 0 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
22 Oct 2025PR01
Import / long-lead
1Rp 189.3M17 Oct 2027
open
725 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
09 Jan 2026MediumPX_KT-202KT-202 governor valve hunting
17 Sept 2025MediumPX_KT-202Replace lamp as per PM finding
06 Jul 2025LowPX_KT-202KT-202 steam leak at gland

Recent goods issues

Posting dateQtyOrderOrder type
06 Jul 20262201000014051Corrective