SEAL,LABYRINTH,DWG.907-7279,FOR KT-202

Material 4300000816 · SEAL · Plant 1000

SMaintainNo stock needed
Material
4300000816
Category
SEAL
Base unit
SET
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
PERMATA SUPLINDO JAYA PT
Lead time
146 d · P80 213 d
Unit price
Rp 129.5M

Recommendation

  • 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~146 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Single sourceOpen PO
On hand / on order
0 / 1
next delivery 17 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 129.5M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 389,340/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~71 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-202
TURBINE FOR KC-202
S142.81

Lead time and procurement

Lead time 146 ± 65 days (PO history + category, 1 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
07 Jun 2026PR06
Regular replenishment
1Rp 129.5M17 Oct 2026
open
132 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
09 Jan 2026MediumPX_KT-202KT-202 governor valve hunting
17 Sept 2025MediumPX_KT-202Replace lamp as per PM finding
06 Jul 2025LowPX_KT-202KT-202 steam leak at gland

Recent goods issues

Never issued in the 17-month history.