NOZZLE,SAFETY VALVE,DWG.894-7413,FOR PRV
Material 4300001877 · NOZZLE · Plant 1000
ASafety-criticalLong-leadReorderCriticalStockout
- Material
- 4300001877
- Category
- NOZZLE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- PRIMA SUPLINDO JAYA PT
- Lead time
- 142 d · P80 177 d
- Unit price
- Rp 5.4M
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~142 days; expected demand during lead time 0.1.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 5.On hand 0 + on order 2 is at or below the reorder point: order 1 now.
- 6.Long lead time: 80% of deliveries took up to 177 days and the fastest seen in its category 69 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 7.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 5.4M · order by 01 Oct 2026
Expected arrival ≈ 142 days
Safety-critical (SCE)Long-leadSingle sourceOpen PO
On hand / on order
0 / 2
next delivery 08 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 5.4M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 249 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 505.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~69 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PRV-1376B SAFETY VALVE HE-237B | A | 1 | 2 | 0.47 |
Lead time and procurement
Lead time 142 ± 50 days (PO history + category, 2 PO lines) · on-time 32%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 15 Aug 2026 | PR06 Regular replenishment | 2 | Rp 5.5M | 08 Dec 2026 open | 115 d |
| 04 Nov 2025 | PR05 Project / turnaround | 1 | Rp 5.4M | 26 Jun 2026 | 234 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Oct 2025 | Medium | PX_PRV-1376B | Leak from packing |
| 31 May 2025 | Medium | PX_PRV-1376B | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 25 Jan 2026 | 1 | 201000001722 | Corrective |