DISC,SAFETY VALVE,DWG.631-2337,FOR PRV-2
Material 4300001936 · DISC · Plant 1000
ASafety-criticalLong-leadReduceExcess
- Material
- 4300001936
- Category
- DISC
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- BUANA INDUSTRI LESTARI PT
- Lead time
- 114 d · P80 171 d
- Unit price
- Rp 7.5M
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~114 days; expected demand during lead time 0.1.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 5.Stock 15 exceeds the level to keep (3) by 12.
- 6.Long lead time: 80% of deliveries took up to 171 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 7.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Safety-critical (SCE)Long-leadSingle sourceOpen PO
On hand / on order
15 / 3
next delivery 07 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 7.5M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 109 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 344.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| UT_PRV-209 SAFETY VALVE PP-500 | A | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 114 ± 64 days (PO history + category, 2 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 01 Sept 2026 | PR05 Project / turnaround | 2 | Rp 7.7M | 07 Dec 2026 open | 97 d |
| 29 Aug 2026 | PR05 Project / turnaround | 1 | Rp 7.4M | 24 Mar 2027 open | 207 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 14 Jun 2026 | 1 | 201000029044 | Corrective |