Sparely
DU

COUPLING,DWG.122-1528,FOR KC-316D

Material 4300002355 · COUPLING · Plant 1000

AReorderNormalSlow-moving
Material
4300002355
Category
COUPLING
Base unit
SET
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
86 d · P80 139 d
Unit price
Rp 8.6M (est.)

Recommendation

  • 1.Forecast 1.2 SET/year: 1.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~86 days; expected demand during lead time 0.3.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 3 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 SET
Rp 25.7M · order by 01 Oct 2026
Expected arrival ≈ 86 days
Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 1%
Unit price
Rp 8.6M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 250 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 573.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-316D
METHANOL FAN
A151.43

Lead time and procurement

Lead time 86 ± 54 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
10 Aug 2026MediumPX_KC-316DOverhaul
03 Aug 2026MediumPX_KC-316DPainting KC-316D
14 May 2026MediumPX_KC-316DKC-316D high vibration
24 Apr 2026LowPX_KC-316DInstall scaffolding at KC-316D
14 Jun 2025MediumPX_KC-316DInstall scaffolding at KC-316D

Recent goods issues

Posting dateQtyOrderOrder type
24 Jan 20262201000039067Corrective