SEAL,LABYRINTH,DWG.280-9237,FOR KT-397A

Material 4300003736 · SEAL · Plant 1000

ALong-leadReduceNon-moving
Material
4300003736
Category
SEAL
Base unit
SET
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
RAJAWALI SARANA PERSADA PT
Lead time
185 d · P80 213 d
Unit price
Rp 293.5M

Recommendation

  • 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~185 days; expected demand during lead time 0.1.
  • 3.A 94.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 7 exceeds the level to keep (1) by 6.
  • 5.Long lead time: 80% of deliveries took up to 213 days and the fastest seen in its category 71 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
7 / 1
next delivery 17 Nov 2026
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
94.3%
stockout risk now 0%
Unit price
Rp 293.5M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 173.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-397A
TURBINE FOR KC-397A
A152.81

Lead time and procurement

Lead time 185 ± 65 days (PO history + category, 2 PO lines) · on-time 9%

PR dateTypeQtyUnit priceDeliveryLead time
28 Nov 2025PR03
Regular replenishment
1Rp 295.4M17 Nov 2026
open
354 d
21 Nov 2025PR06
Regular replenishment
2Rp 291.6M21 Mar 2026120 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A
16 May 2026MediumPX_KT-397AReplace lamp as per PM finding
14 May 2026LowPX_KT-397AKT-397A trip test
02 Apr 2026MediumPX_KT-397AFollow up after steam upset KT-397A
10 May 2025MediumPX_KT-397ALeak from packing

Recent goods issues

Never issued in the 17-month history.