BEARING,JOURNAL,DWG.670-4486,FOR KC-536A
Material 4300006850 · BEARING · Plant 1000
ALong-leadReorderNormalSlow-moving
- Material
- 4300006850
- Category
- BEARING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- PERMATA SUPLINDO JAYA PT
- Lead time
- 91 d · P80 127 d
- Unit price
- Rp 486.1M
Recommendation
- 1.Forecast 1.4 SET/year: 1.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~91 days; expected demand during lead time 0.3.
- 3.A 95.3% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 1 now.
- 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
1 SET
Rp 486.1M · order by 01 Oct 2026
Expected arrival ≈ 91 days
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
95.3%
stockout risk now 5%
Unit price
Rp 486.1M
PO history
ML early warning: 0% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 448 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 670.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-536A LUBE OIL BLOWER | A | 1 | 11 | 4.42 |
Lead time and procurement
Lead time 91 ± 40 days (PO history + category, 2 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 16 Oct 2025 | PR06 Regular replenishment | 1 | Rp 483.3M | 04 Mar 2026 | 139 d |
| 10 Oct 2025 | PR03 Regular replenishment | 2 | Rp 488.9M | 12 Mar 2026 | 153 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 Sept 2026 | High | PX_KC-536A | Overhaul |
| 08 Aug 2026 | High | PX_KC-536A | KC-536A bearing temp high |
| 24 Jul 2026 | High | PX_KC-536A | Install scaffolding at KC-536A |
| 05 Jul 2026 | Medium | PX_KC-536A | Leak from packing |
| 24 Jun 2026 | Medium | PX_KC-536A | KC-536A bearing temp high |
| 31 Mar 2026 | Medium | PX_KC-536A | Install scaffolding at KC-536A |
| 18 Jan 2026 | Low | PX_KC-536A | Replace lamp as per PM finding |
| 10 Jan 2026 | Low | PX_KC-536A | KC-536A bearing temp high |
| 17 Nov 2025 | Medium | PX_KC-536A | Overhaul |
| 08 Nov 2025 | Medium | PX_KC-536A | Inspect coupling KC-536A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 Jul 2025 | 1 | 201000000144 | Corrective |