COUPLING,DWG.917-2849,FOR KC-536A

Material 4300006977 · COUPLING · Plant 1000

ALong-leadReorderCriticalStockout
Material
4300006977
Category
COUPLING
Base unit
SET
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
ANUGRAH INSTRUMEN SENTOSA PT
Lead time
89 d · P80 117 d
Unit price
Rp 2.5M

Recommendation

  • 1.Forecast 1.7 SET/year: 1.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~89 days; expected demand during lead time 0.4.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 5 now.
  • 5.Long lead time: 80% of deliveries took up to 117 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
5 SET
Rp 12.4M · order by 01 Oct 2026
Expected arrival ≈ 89 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.9%
stockout risk now 33%
Unit price
Rp 2.5M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 79 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-536A
LUBE OIL BLOWER
A1114.42

Lead time and procurement

Lead time 89 ± 47 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
07 Dec 2025PR06
Regular replenishment
2Rp 2.5M24 Jan 202648 d
27 May 2025PR06
Regular replenishment
2Rp 2.4M01 Oct 2025127 d
26 May 2025PR06
Regular replenishment
2Rp 2.5M04 Sept 2025101 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Sept 2026HighPX_KC-536AOverhaul
08 Aug 2026HighPX_KC-536AKC-536A bearing temp high
24 Jul 2026HighPX_KC-536AInstall scaffolding at KC-536A
05 Jul 2026MediumPX_KC-536ALeak from packing
24 Jun 2026MediumPX_KC-536AKC-536A bearing temp high
31 Mar 2026MediumPX_KC-536AInstall scaffolding at KC-536A
18 Jan 2026LowPX_KC-536AReplace lamp as per PM finding
10 Jan 2026LowPX_KC-536AKC-536A bearing temp high
17 Nov 2025MediumPX_KC-536AOverhaul
08 Nov 2025MediumPX_KC-536AInspect coupling KC-536A

Recent goods issues

Posting dateQtyOrderOrder type
14 Jul 20261201000001615Corrective