TRIM SET,CONTROL VALVE,DWG.268-3953,FOR

Material 4300007193 · TRIM SET · Plant 1000

AReorderCriticalStockout
Material
4300007193
Category
TRIM SET
Base unit
SET
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
115 d · P80 74 d
Unit price
Rp 30.9M

Recommendation

  • 1.Forecast 0.0 SET/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~115 days; expected demand during lead time 0.0.
  • 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 1 now.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
1 SET
Rp 30.9M · order by 01 Oct 2026
Expected arrival ≈ 115 days
Last turnaround used 1Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.3%
stockout risk now 1%
Unit price
Rp 30.9M
PO history
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 34.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1033A
PP-1597B OUTLET FLOW
A120.54

Lead time and procurement

Lead time 115 ± 44 days (PO history, 3 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
11 Jul 2026PR06
Regular replenishment
1Rp 31.1M24 Sept 202675 d
09 Mar 2026PR06
Regular replenishment
1Rp 30.7M13 May 202665 d
27 Jul 2025PR06
Regular replenishment
2Rp 30.9M07 Oct 202572 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
10 May 2026MediumPX_FCV-1033AFCV-1033A; valve hunting
10 May 2025MediumPX_FCV-1033AFCV-1033A; IA leak from regulator

Recent goods issues

Posting dateQtyOrderOrder type
09 Nov 20251203000029164Turnaround