TRIM SET,CONTROL VALVE,DWG.268-3953,FOR
Material 4300007193 · TRIM SET · Plant 1000
AReorderCriticalStockout
- Material
- 4300007193
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- PERMATA INSTRUMEN INTERNASIONAL PT
- Lead time
- 115 d · P80 74 d
- Unit price
- Rp 30.9M
Recommendation
- 1.Forecast 0.0 SET/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~115 days; expected demand during lead time 0.0.
- 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 1 now.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
1 SET
Rp 30.9M · order by 01 Oct 2026
Expected arrival ≈ 115 days
Last turnaround used 1Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.3%
stockout risk now 1%
Unit price
Rp 30.9M
PO history
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (1 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 34.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-1033A PP-1597B OUTLET FLOW | A | 1 | 2 | 0.54 |
Lead time and procurement
Lead time 115 ± 44 days (PO history, 3 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 11 Jul 2026 | PR06 Regular replenishment | 1 | Rp 31.1M | 24 Sept 2026 | 75 d |
| 09 Mar 2026 | PR06 Regular replenishment | 1 | Rp 30.7M | 13 May 2026 | 65 d |
| 27 Jul 2025 | PR06 Regular replenishment | 2 | Rp 30.9M | 07 Oct 2025 | 72 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 10 May 2026 | Medium | PX_FCV-1033A | FCV-1033A; valve hunting |
| 10 May 2025 | Medium | PX_FCV-1033A | FCV-1033A; IA leak from regulator |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 09 Nov 2025 | 1 | 203000029164 | Turnaround |