POSITIONER,VALVE,DWG.179-2303,FOR FCV-10

Material 4300007220 · POSITIONER · Plant 1000

AReduceSlow-moving
Material
4300007220
Category
POSITIONER
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
95 d · P80 166 d
Unit price
Rp 39.9M (est.)

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~95 days; expected demand during lead time 0.0.
  • 3.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 5 exceeds the level to keep (2) by 3; the level includes the 2 used in the last turnaround.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Last turnaround used 2Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.4%
stockout risk now 0%
Unit price
Rp 39.9M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 18.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~40 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1033A
PP-1597B OUTLET FLOW
A120.54

Lead time and procurement

Lead time 95 ± 64 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
10 May 2026MediumPX_FCV-1033AFCV-1033A; valve hunting
10 May 2025MediumPX_FCV-1033AFCV-1033A; IA leak from regulator

Recent goods issues

Posting dateQtyOrderOrder type
07 Nov 20251203000029164Turnaround
06 Nov 20251203000029164Turnaround