THERMOWELL,DWG.933-5504,FOR TEL-1080
Material 4300007377 · THERMOWELL · Plant 1000
SMonitorNo stock needed
- Material
- 4300007377
- Category
- THERMOWELL
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- ANUGRAH TEKNOLOGI INTERNASIONAL PT
- Lead time
- 94 d · P80 144 d
- Unit price
- Rp 7.1M
Recommendation
- 1.Forecast 2.0 EA/year: 2.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~94 days; expected demand during lead time 0.5.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Single sourceOpen PO
On hand / on order
0 / 6
next delivery 07 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 1%
Unit price
Rp 7.1M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 182 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~43 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TEL-1080 TEMPERATURE | S | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 94 ± 76 days (PO history, 4 PO lines) · on-time 23%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 02 Sept 2026 | PR03 Regular replenishment | 3 | Rp 7.0M | 07 Nov 2026 open | 66 d |
| 15 Jul 2026 | PR01 Import / long-lead | 3 | Rp 7.1M | 02 Apr 2027 open | 261 d |
| 02 Jun 2026 | PR03 Regular replenishment | 1 | Rp 7.2M | 26 Jul 2026 | 54 d |
| 08 Mar 2026 | PR06 Regular replenishment | 1 | Rp 7.3M | 20 Apr 2026 | 43 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 02 Apr 2026 | 2 | 201000020555 | Corrective |
| 24 Jul 2025 | 2 | 205000036740 | Other maintenance |
| 24 Jul 2025 | 3 | 205000036740 | Other maintenance |