BEARING,THRUST PAD,DWG.885-5161,FOR KC-5

Material 4300007876 · BEARING · Plant 1000

AReduceNon-moving
Material
4300007876
Category
BEARING
Base unit
SET
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
PERMATA SUPLINDO JAYA PT
Lead time
55 d · P80 127 d
Unit price
Rp 105.9M

Recommendation

  • 1.Forecast 0.0 SET/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~55 days; expected demand during lead time 0.0.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 10 exceeds the level to keep (1) by 9.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Single sourceOpen POLead time estimated
On hand / on order
10 / 1
next delivery 03 Apr 2028
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.6%
stockout risk now 0%
Unit price
Rp 105.9M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 11.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 1 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-527
METHANOL BLOWER
A200.57

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
06 May 2026PR05
Project / turnaround
1Rp 105.9M03 Apr 2028
open
698 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.