DISC,SAFETY VALVE,DWG.949-9112,FOR PRV-8

Material 4300008048 · DISC · Plant 1000

ASafety-criticalLong-leadMonitorSlow-moving
Material
4300008048
Category
DISC
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
122 d · P80 171 d
Unit price
Rp 9.6M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~122 days; expected demand during lead time 0.1.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
  • 5.Long lead time: 80% of deliveries took up to 171 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Safety-critical (SCE)Long-leadSingle sourceOpen PO
On hand / on order
3 / 1
next delivery 13 Feb 2027
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
99.9%
stockout risk now 0%
Unit price
Rp 9.6M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 366 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 134.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_PRV-855C
SAFETY VALVE HE-1590B
A100.04

Lead time and procurement

Lead time 122 ± 64 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
18 Sept 2026PR06
Regular replenishment
1Rp 10.0M13 Feb 2027
open
148 d
24 Jan 2026PR03
Regular replenishment
2Rp 9.6M09 Aug 2026197 d
17 Jul 2025PR03
Regular replenishment
2Rp 9.6M05 Sept 2026415 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20252201000033812Corrective
30 Sept 20251201000033812Corrective