SEAL,LABYRINTH,DWG.381-1020,FOR KC-391D

Material 4300008344 · SEAL · Plant 1000

ALong-leadMonitorStockout
Material
4300008344
Category
SEAL
Base unit
SET
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN MAKMUR PT
Lead time
158 d · P80 213 d
Unit price
Rp 56.7M

Recommendation

  • 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~158 days; expected demand during lead time 0.0.
  • 3.A 97.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Long lead time: 80% of deliveries took up to 213 days and the fastest seen in its category 71 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadLast turnaround used 1Single sourceOpen PO
On hand / on order
0 / 1
next delivery 26 Mar 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
97.5%
stockout risk now 0%
Unit price
Rp 56.7M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 87.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-391D
QUENCH WATER COMPRESSOR
A121.43

Lead time and procurement

Lead time 158 ± 65 days (PO history + category, 2 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
26 Aug 2026PR06
Regular replenishment
1Rp 58.2M26 Mar 2027
open
212 d
12 Aug 2025PR06
Regular replenishment
1Rp 55.3M17 Dec 2025127 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
27 Dec 2025LowPX_KC-391DLeak from packing
18 Jul 2025HighPX_KC-391DKC-391D high vibration

Recent goods issues

Posting dateQtyOrderOrder type
26 Dec 20251203000006078Turnaround