NOZZLE,SAFETY VALVE,DWG.750-8988,FOR PRV

Material 4300008803 · NOZZLE · Plant 1000

SSafety-criticalReorderNormalSlow-moving
Material
4300008803
Category
NOZZLE
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
121 d · P80 177 d
Unit price
Rp 20.3M (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.7 EA/year: 1.7 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~121 days; expected demand during lead time 0.6.
  • 4.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 5.On hand 2 + on order 0 is at or below the reorder point: order 4 now.
Proposed purchase requisition
4 EA
Rp 81.1M · order by 01 Oct 2026
Expected arrival ≈ 121 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.7%
stockout risk now 3%
Unit price
Rp 20.3M
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 231 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~69 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-489B
SAFETY VALVE PP-1106A
S172.18

Lead time and procurement

Lead time 121 ± 50 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Sept 2026LowPX_PRV-489BRepair insulation PRV-489B
10 Jun 2026LowPX_PRV-489BPRV-489B simmering
13 Dec 2025MediumPX_PRV-489BRecertification PRV-489B
20 Oct 2025HighPX_PRV-489BLeak from packing
08 Oct 2025LowPX_PRV-489BInstall scaffolding at PRV-489B
29 Sept 2025MediumPX_PRV-489BPRV-489B passing
09 May 2025MediumPX_PRV-489BRecertification PRV-489B

Recent goods issues

Posting dateQtyOrderOrder type
12 Feb 20262201000019526Corrective