TRIM SET,CONTROL VALVE,DWG.647-1416,FOR
Material 4300009511 · TRIM SET · Plant 1000
CMonitorStockout
- Material
- 4300009511
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- GUNUNG PERKASA NUSANTARA PT
- Lead time
- 170 d · P80 236 d
- Unit price
- Rp 54.2M
Recommendation
- 1.Forecast 1.3 SET/year: 0.5 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 2.Lead time ~170 days; expected demand during lead time 1.0 (incl. 0.7 planned).
- 3.A 77.6% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
Convert to Stock ItemSingle sourceOpen POPlanned demand in lead time
On hand / on order
0 / 2
next delivery 07 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
77.6%
stockout risk now 3%
Unit price
Rp 54.2M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 184 days ago, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 17.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~75 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-274A HE-1596B OUTLET FLOW | C | 1 | 3 | 0.96 |
Lead time and procurement
Lead time 170 ± 83 days (PO history + category, 1 PO lines) · on-time 35%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 18 May 2026 | PR06 Regular replenishment | 2 | Rp 54.2M | 07 Dec 2026 open | 203 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 09 Dec 2026 | PX_FCV-274A | Final Element Overhaul; Control Valve | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Aug 2026 | Medium | PX_FCV-274A | FCV-274A; IA leak from regulator |
| 14 Oct 2025 | Medium | PX_FCV-274A | FCV-274A; IA leak from regulator |
| 25 May 2025 | Low | PX_FCV-274A | FCV-274A passing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 31 Mar 2026 | 1 | 201000037731 | Corrective |