BEARING,THRUST PAD,DWG.826-2243,FOR KC-4
Material 4300009763 · BEARING · Plant 1000
ALong-leadMaintainInsurance gap
- Material
- 4300009763
- Category
- BEARING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- ATLAS TURBO SERVICES INC
- Lead time
- 69 d · P80 127 d
- Unit price
- Rp 95.6M
Recommendation
- 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~69 days; expected demand during lead time 0.0.
- 3.A 97.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 27 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
97.9%
stockout risk now 0%
Unit price
Rp 95.6M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 54.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-479C DILUTION STEAM COMPRESSOR | A | 1 | 5 | 2.71 |
Lead time and procurement
Lead time 69 ± 40 days (PO history + category, 1 PO lines) · on-time 35%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 10 Aug 2026 | PR06 Regular replenishment | 1 | Rp 95.6M | 27 Nov 2026 open | 109 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 10 Sept 2026 | Medium | PX_KC-479C | KC-479C bearing temp high |
| 18 Aug 2026 | Low | PX_KC-479C | Leak from packing |
| 31 May 2026 | Medium | PX_KC-479C | [MSI-B-26-KNK-222/M] Replace line |
| 23 Sept 2025 | Low | PX_KC-479C | Overhaul |
| 02 Jul 2025 | Low | PX_KC-479C | KC-479C bearing temp high |
Recent goods issues
Never issued in the 17-month history.