SPRING,SAFETY VALVE,DWG.819-2874,FOR KT-

Material 4300012199 · SPRING · Plant 1000

SMonitorNo stock needed
Material
4300012199
Category
SPRING
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
SAMUDRA MESINDO ABADI PT
Lead time
128 d · P80 196 d
Unit price
Rp 15.3M

Recommendation

  • 1.Forecast 2.4 EA/year: 2.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~128 days; expected demand during lead time 0.9.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 35%
Unit price
Rp 15.3M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 315 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~77 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-383A
TURBINE FOR KC-383A
S173.67

Lead time and procurement

Lead time 128 ± 65 days (PO history + category, 1 PO lines) · on-time 20%

PR dateTypeQtyUnit priceDeliveryLead time
27 May 2026PR06
Regular replenishment
1Rp 15.3M05 Sept 2026101 d
15 May 2025PR05
Project / turnaround
2Rp 15.4M23 Aug 2026465 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
24 May 2026HighPX_KT-383AKT-383A steam leak at gland
23 Jun 2025MediumPX_KT-383AKT-383A governor valve hunting

Recent goods issues

Posting dateQtyOrderOrder type
20 Nov 20252201000016627Corrective