TRIM SET,CONTROL VALVE,DWG.319-7351,FOR
Material 4300012308 · TRIM SET · Plant 1000
AReorderNormalSlow-moving
- Material
- 4300012308
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 159 d · P80 236 d
- Unit price
- Rp 78.5M (est.)
Recommendation
- 1.Forecast 1.3 SET/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~159 days; expected demand during lead time 0.6.
- 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 4.On hand 4 + on order 0 is at or below the reorder point: order 2 now.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 157.0M · order by 01 Oct 2026
Expected arrival ≈ 159 days
Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.7%
stockout risk now 0%
Unit price
Rp 78.5M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 186 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-1359 CONTROL VALVE | A | 1 | 3 | 1.39 |
Lead time and procurement
Lead time 159 ± 83 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 02 Dec 2025 | Medium | PX_FCV-1359 | [MSI-B-25-XWM-358] Permanent repair |
| 16 Aug 2025 | Low | PX_FCV-1359 | FCV-1359; valve hunting |
| 26 Jun 2025 | Medium | PX_FCV-1359 | Overhaul FCV-1359 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 29 Mar 2026 | 2 | 201000020365 | Corrective |