Sparely
DU

COUPLING,DWG.548-8136,FOR PP-1838D

Material 4300012371 · COUPLING · Plant 1000

ALong-leadReorderCriticalStockout
Material
4300012371
Category
COUPLING
Base unit
SET
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
CAHAYA TEKNIK PERSADA PT
Lead time
77 d · P80 139 d
Unit price
Rp 20.0M

Recommendation

  • 1.Forecast 1.0 SET/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~77 days; expected demand during lead time 0.2.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Long lead time: 80% of deliveries took up to 139 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 SET
Rp 60.0M · order by 01 Oct 2026
Expected arrival ≈ 77 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.9%
stockout risk now 19%
Unit price
Rp 20.0M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 28 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 960.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1838D
METHANE PUMP
A151.90

Lead time and procurement

Lead time 77 ± 54 days (PO history + category, 1 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
29 Nov 2025PR06
Regular replenishment
2Rp 20.0M16 Jan 202648 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Aug 2026MediumPX_PP-1838DPP-1838D abnormal noise
31 Mar 2026MediumPX_PP-1838D[MSI-B-26-LPR-116/M] Replace line
22 Mar 2026MediumPX_PP-1838DOil leak at PP-1838D bearing housing
08 Sept 2025MediumPX_PP-1838DReplace bearing PP-1838D
26 May 2025LowPX_PP-1838DOil leak at PP-1838D bearing housing

Recent goods issues

Posting dateQtyOrderOrder type
03 Sept 20261204000038666Preventive