COUPLING,DWG.464-7749,FOR PP-1838D
Material 4300012387 · COUPLING · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4300012387
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- CAHAYA ELEKTRIK JAYA PT
- Lead time
- 108 d · P80 139 d
- Unit price
- Rp 20.2M
Recommendation
- 1.Forecast 0.6 SET/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~108 days; expected demand during lead time 0.2.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
- 5.Long lead time: 80% of deliveries took up to 139 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 SET
Rp 60.5M · order by 01 Oct 2026
Expected arrival ≈ 108 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.9%
stockout risk now 17%
Unit price
Rp 20.2M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 470 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 589.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1838D METHANE PUMP | A | 1 | 5 | 1.90 |
Lead time and procurement
Lead time 108 ± 54 days (PO history + category, 1 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 24 Nov 2025 | PR06 Regular replenishment | 2 | Rp 20.2M | 15 May 2026 | 172 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 23 Aug 2026 | Medium | PX_PP-1838D | PP-1838D abnormal noise |
| 31 Mar 2026 | Medium | PX_PP-1838D | [MSI-B-26-LPR-116/M] Replace line |
| 22 Mar 2026 | Medium | PX_PP-1838D | Oil leak at PP-1838D bearing housing |
| 08 Sept 2025 | Medium | PX_PP-1838D | Replace bearing PP-1838D |
| 26 May 2025 | Low | PX_PP-1838D | Oil leak at PP-1838D bearing housing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 18 Jun 2025 | 1 | 201000035411 | Corrective |