IMPELLER,DWG.214-8960,FOR PP-745

Material 4300012471 · IMPELLER · Plant 1000

BLong-leadReduceSlow-moving
Material
4300012471
Category
IMPELLER
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
CAHAYA TEKNIK PERSADA PT
Lead time
161 d · P80 276 d
Unit price
Rp 176.6M

Recommendation

  • 1.Forecast 0.9 EA/year: 0.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~161 days; expected demand during lead time 0.4.
  • 3.A 93.4% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 4 exceeds the level to keep (2) by 2.
  • 5.Long lead time: 80% of deliveries took up to 276 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadConvert to Stock ItemSingle source
On hand / on order
4 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
93.4%
stockout risk now 0%
Unit price
Rp 176.6M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 329 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 529.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~105 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-745
FEED PUMP
B172.76

Lead time and procurement

Lead time 161 ± 88 days (PO history + category, 1 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
11 Sept 2025PR03
Regular replenishment
2Rp 176.6M12 Dec 202592 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 Aug 2026MediumPX_PP-745PP-745 high vibration
08 Jun 2026EmergencyPX_PP-745[MSI-B-26-YAH-100/M] Replace line
13 May 2026LowPX_PP-745Leak from packing
06 Feb 2026LowPX_PP-745Repair insulation PP-745
20 Nov 2025MediumPX_PP-745Install cover plate for MCP cracking
19 Oct 2025LowPX_PP-745Oil leak at PP-745 bearing housing
26 May 2025LowPX_PP-745Overhaul PP-745

Recent goods issues

Posting dateQtyOrderOrder type
06 Nov 20251201000007949Corrective
28 May 20251201000021691Corrective