COUPLING,DWG.127-2227,FOR PP-615A
Material 4300014305 · COUPLING · Plant 1000
BLong-leadMonitorSlow-moving
- Material
- 4300014305
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- RAJAWALI PERKASA JAYA PT
- Lead time
- 96 d · P80 139 d
- Unit price
- Rp 11.0M
Recommendation
- 1.Forecast 1.4 SET/year: 0.7 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 2.Lead time ~96 days; expected demand during lead time 0.9 (incl. 0.7 planned).
- 3.A 94.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 4.
- 4.Long lead time: 80% of deliveries took up to 139 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadConvert to Stock ItemSingle sourceOpen POPlanned demand in lead time
On hand / on order
4 / 1
next delivery 10 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
4
order qty 3
Service level
94.0%
stockout risk now 0%
Unit price
Rp 11.0M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 283 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 55.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~44 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-615A PROPYLENE PUMP | B | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 96 ± 54 days (PO history + category, 1 PO lines) · on-time 15%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 07 Jul 2026 | PR06 Regular replenishment | 1 | Rp 11.0M | 10 Nov 2026 open | 126 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Jan 2027 | PX_PP-615A | Pump overhaul | 0.72 |
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 22 Dec 2025 | 3 | 201000007382 | Corrective |