DISC,SAFETY VALVE,DWG.813-1279,FOR PRV-1

Material 4300014637 · DISC · Plant 1000

BSafety-criticalLong-leadReduceNon-moving
Material
4300014637
Category
DISC
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
PERMATA INDUSTRI JAYA PT
Lead time
93 d · P80 171 d
Unit price
Rp 36.0M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality B). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~93 days; expected demand during lead time 0.0.
  • 4.Buying on demand would cost less, but a safety-critical part keeps 1 spare: reorder only when the shelf is empty.
  • 5.Stock 5 exceeds the level to keep (1) by 4.
  • 6.Long lead time: 80% of deliveries took up to 171 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Safety-critical (SCE)Long-leadSingle sourceOpen PO
On hand / on order
5 / 2
next delivery 11 Aug 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 36.0M
PO history
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-1800
SAFETY VALVE HE-786
B100.04

Lead time and procurement

Lead time 93 ± 64 days (PO history + category, 1 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
23 Jul 2026PR01
Import / long-lead
2Rp 35.1M11 Aug 2027
open
384 d
05 Sept 2025PR03
Regular replenishment
2Rp 37.0M22 Dec 2025108 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.