POSITIONER,VALVE,DWG.540-3053,FOR PCV-84

Material 4300014766 · POSITIONER · Plant 1000

CMonitorHealthy
Material
4300014766
Category
POSITIONER
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
SAMUDRA UTAMA GLOBAL PT
Lead time
75 d · P80 166 d
Unit price
Rp 30.3M

Recommendation

  • 1.Forecast 2.1 EA/year: 2.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~75 days; expected demand during lead time 0.4.
  • 3.A 86.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 3.
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
3
order qty 3
Service level
86.8%
stockout risk now 13%
Unit price
Rp 30.3M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 1 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 12.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~40 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-846
BY PASS DUCT
C120.51

Lead time and procurement

Lead time 75 ± 64 days (PO history + category, 2 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
28 Jun 2026PR03
Regular replenishment
2Rp 30.6M21 Aug 202654 d
06 May 2025PR04
Regular (other)
1Rp 30.0M12 Jun 202537 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
27 Sept 2026MediumPX_PCV-846Replace lamp as per PM finding
15 May 2025MediumPX_PCV-846Install scaffolding at PCV-846

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20263201000015377Corrective