SLEEVE,SHAFT,DWG.456-9747,FOR PP-1448B
Material 4300015164 · SLEEVE · Plant 1000
BLong-leadReduceSlow-moving
- Material
- 4300015164
- Category
- SLEEVE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- CAHAYA TEKNIK PERSADA PT
- Lead time
- 125 d · P80 210 d
- Unit price
- Rp 12.9M
Recommendation
- 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~125 days; expected demand during lead time 0.1.
- 3.A 99.1% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Stock 30 exceeds the level to keep (2) by 28.
- 5.Long lead time: 80% of deliveries took up to 210 days and the fastest seen in its category 67 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
30 / 5
next delivery 03 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.1%
stockout risk now 0%
Unit price
Rp 12.9M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 228 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 144.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~67 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1448B ETHYLENE PUMP | B | 1 | 1 | 0.62 |
Lead time and procurement
Lead time 125 ± 55 days (PO history + category, 2 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 15 Aug 2026 | PR05 Project / turnaround | 2 | Rp 12.5M | 29 Jan 2027 open | 167 d |
| 09 Aug 2026 | PR06 Regular replenishment | 1 | Rp 13.4M | 03 Oct 2026 open | 55 d |
| 27 Feb 2026 | PR01 Import / long-lead | 2 | Rp 12.9M | 23 Apr 2028 open | 786 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Jun 2025 | Medium | PX_PP-1448B | PP-1448B abnormal noise |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 15 Feb 2026 | 1 | 201000026885 | Corrective |