COUPLING,DWG.363-2165,FOR PP-506A
Material 4300015347 · COUPLING · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4300015347
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- LANGIT INDUSTRI PRATAMA PT
- Lead time
- 88 d · P80 139 d
- Unit price
- Rp 4.3M
Recommendation
- 1.Forecast 2.9 SET/year: 2.9 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~88 days; expected demand during lead time 0.7.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 7.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 7 now.
- 5.Long lead time: 80% of deliveries took up to 139 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
7 SET
Rp 30.3M · order by 01 Oct 2026
Expected arrival ≈ 88 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
7
order qty 3
Service level
99.9%
stockout risk now 50%
Unit price
Rp 4.3M
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 107 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-506A COOLING WATER PUMP | A | 1 | 23 | 8.76 |
Lead time and procurement
Lead time 88 ± 54 days (PO history + category, 1 PO lines) · on-time 53%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 21 Jan 2026 | PR03 Regular replenishment | 2 | Rp 4.3M | 26 Apr 2026 | 95 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 11 Sept 2026 | Low | PX_PP-506A | PP-506A high vibration |
| 09 Sept 2026 | Medium | PX_PP-506A | Replace lamp as per PM finding |
| 01 Aug 2026 | Medium | PX_PP-506A | Oil leak at PP-506A bearing housing |
| 20 Jun 2026 | Medium | PX_PP-506A | Replace lamp as per PM finding |
| 11 Jun 2026 | Low | PX_PP-506A | Leak from packing |
| 30 May 2026 | Low | PX_PP-506A | Install scaffolding at PP-506A |
| 28 May 2026 | Medium | PX_PP-506A | PP-506A discharge pressure low |
| 19 May 2026 | Medium | PX_PP-506A | PP-506A discharge pressure low |
| 12 Apr 2026 | Medium | PX_PP-506A | Overhaul PP-506A |
| 31 Mar 2026 | Low | PX_PP-506A | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 16 Jun 2026 | 1 | 201000004242 | Corrective |