Sparely
DU

BEARING,THRUST PAD,DWG.158-5001,FOR KC-8

Material 4300015922 · BEARING · Plant 1000

AMonitorInsurance gap
Material
4300015922
Category
BEARING
Base unit
SET
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 219.3M (est.)

Recommendation

  • 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~55 days; expected demand during lead time 0.0.
  • 3.A 98.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
98.6%
stockout risk now 1%
Unit price
Rp 219.3M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 45.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-854C
FEED FAN
A172.28

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Sept 2026MediumPX_KC-854COverhaul
29 Jul 2026MediumPX_KC-854CInstall scaffolding at KC-854C
17 Jul 2026LowPX_KC-854CPainting KC-854C
13 Mar 2026MediumPX_KC-854CKC-854C bearing temp high
22 Nov 2025MediumPX_KC-854CKC-854C lube oil filter DP high
14 Sept 2025MediumPX_KC-854C[MSI-B-25-TSW-309] Permanent repair
20 May 2025MediumPX_KC-854CReplace lamp as per PM finding

Recent goods issues

Never issued in the 17-month history.