DEMISTER PAD,DWG.904-5950,FOR VD-1642
Material 4300016027 · DEMISTER PAD · Plant 1000
ALong-leadMaintainNo stock needed
- Material
- 4300016027
- Category
- DEMISTER PAD
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- PERMATA INSTRUMEN JAYA PT
- Lead time
- 85 d · P80 147 d
- Unit price
- Rp 41.5M
Recommendation
- 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~85 days; expected demand during lead time 0.0.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Long lead time: 80% of deliveries took up to 147 days and the fastest seen in its category 34 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 41.5M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~34 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_VD-1642 HYDROGEN KO DRUM | A | 1 | 2 | 0.08 |
Lead time and procurement
Lead time 85 ± 59 days (PO history + category, 1 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 23 Jan 2026 | PR06 Regular replenishment | 2 | Rp 41.5M | 06 Mar 2026 | 42 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 11 Mar 2026 | Low | PX_VD-1642 | Install scaffolding at VD-1642 |
| 09 May 2025 | Medium | PX_VD-1642 | Inspect VD-1642 |
Recent goods issues
Never issued in the 17-month history.