TRIM SET,CONTROL VALVE,DWG.429-5338,FOR
Material 4300016162 · TRIM SET · Plant 1000
CReduceSlow-moving
- Material
- 4300016162
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- SURYA ENERGI JAYA PT
- Lead time
- 133 d · P80 236 d
- Unit price
- Rp 35.7M
Recommendation
- 1.Forecast 0.1 SET/year: 0.1 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~133 days; expected demand during lead time 0.1.
- 3.A 94.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 3 exceeds the level to keep (1) by 2.
Single sourceOpen PO
On hand / on order
3 / 1
next delivery 30 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
94.8%
stockout risk now 0%
Unit price
Rp 35.7M
PO history
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 381 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~75 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_PCV-1975 PRESSURE CONTROL VALVE | C | 1 | 0 | 0.08 |
Lead time and procurement
Lead time 133 ± 83 days (PO history + category, 2 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 21 Jun 2026 | PR05 Project / turnaround | 1 | Rp 36.3M | 30 Oct 2026 open | 131 d |
| 29 May 2026 | PR06 Regular replenishment | 2 | Rp 35.2M | 25 Jul 2026 | 57 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 15 Sept 2025 | 1 | 201000020728 | Corrective |