DEMISTER PAD,DWG.985-9625,FOR VD-884
Material 4300016799 · DEMISTER PAD · Plant 1000
CReduceExcess
- Material
- 4300016799
- Category
- DEMISTER PAD
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- CAHAYA LOGAM PRATAMA PT
- Lead time
- 85 d · P80 99 d
- Unit price
- Rp 5.2M
Recommendation
- 1.Forecast 2.0 EA/year: 2.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~85 days; expected demand during lead time 0.5.
- 3.A 96.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 5.
- 4.Stock 9 exceeds the level to keep (5) by 4.
Single source
On hand / on order
9 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
5
order qty 3
Service level
96.0%
stockout risk now 0%
Unit price
Rp 5.2M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 52 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 20.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~34 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_VD-884 QUENCH WATER KO DRUM | C | 1 | 0 | 0.08 |
Lead time and procurement
Lead time 85 ± 43 days (PO history, 4 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 16 May 2026 | PR06 Regular replenishment | 2 | Rp 5.0M | 19 Jun 2026 | 34 d |
| 21 Nov 2025 | PR05 Project / turnaround | 2 | Rp 5.1M | 01 Mar 2026 | 100 d |
| 03 Nov 2025 | PR03 Regular replenishment | 2 | Rp 5.3M | 10 Feb 2026 | 99 d |
| 27 Jun 2025 | PR06 Regular replenishment | 2 | Rp 5.4M | 31 Aug 2025 | 65 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 Aug 2026 | 2 | 201000013778 | Corrective |
| 09 Aug 2026 | 1 | 201000013778 | Corrective |