Sparely
DU

DEMISTER PAD,DWG.985-9625,FOR VD-884

Material 4300016799 · DEMISTER PAD · Plant 1000

CReduceExcess
Material
4300016799
Category
DEMISTER PAD
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
CAHAYA LOGAM PRATAMA PT
Lead time
85 d · P80 99 d
Unit price
Rp 5.2M

Recommendation

  • 1.Forecast 2.0 EA/year: 2.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~85 days; expected demand during lead time 0.5.
  • 3.A 96.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 5.
  • 4.Stock 9 exceeds the level to keep (5) by 4.
Single source
On hand / on order
9 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
5
order qty 3
Service level
96.0%
stockout risk now 0%
Unit price
Rp 5.2M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 52 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 20.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~34 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_VD-884
QUENCH WATER KO DRUM
C100.08

Lead time and procurement

Lead time 85 ± 43 days (PO history, 4 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
16 May 2026PR06
Regular replenishment
2Rp 5.0M19 Jun 202634 d
21 Nov 2025PR05
Project / turnaround
2Rp 5.1M01 Mar 2026100 d
03 Nov 2025PR03
Regular replenishment
2Rp 5.3M10 Feb 202699 d
27 Jun 2025PR06
Regular replenishment
2Rp 5.4M31 Aug 202565 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
10 Aug 20262201000013778Corrective
09 Aug 20261201000013778Corrective