BLADE,ROTOR,DWG.416-4642,FOR KT-264A
Material 4300017964 · BLADE · Plant 1000
SReduceNon-moving
- Material
- 4300017964
- Category
- BLADE
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 181 d · P80 263 d
- Unit price
- Rp 381.5M (est.)
Recommendation
- 1.Forecast 0.8 SET/year: 0.1 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
- 2.Lead time ~181 days; expected demand during lead time 0.8 (incl. 0.7 planned).
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 19 exceeds the level to keep (0) by 19.
Convert to Non StockPlanned demand in lead timePrice estimatedLead time estimated
On hand / on order
19 / 0
no open PO
Today Min / Max
4 / 11
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 381.5M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 404,465/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~99 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-264A TURBINE FOR KC-264A | S | 1 | 4 | 2.39 |
Lead time and procurement
Lead time 181 ± 109 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 26 Dec 2026 | PX_KT-264A | Turbine major overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 11 Jun 2026 | Low | PX_KT-264A | Leak from packing |
| 21 Apr 2026 | Low | PX_KT-264A | Follow up after steam upset KT-264A |
| 21 Oct 2025 | Medium | PX_KT-264A | KT-264A governor valve hunting |
| 31 May 2025 | Medium | PX_KT-264A | Install scaffolding at KT-264A |
Recent goods issues
Never issued in the 17-month history.