Sparely
DU

SEAL,LABYRINTH,DWG.643-8357,FOR KT-264A

Material 4300018169 · SEAL · Plant 1000

SReduceNon-moving
Material
4300018169
Category
SEAL
Base unit
SET
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN MAKMUR PT
Lead time
173 d · P80 213 d
Unit price
Rp 110.4M

Recommendation

  • 1.Forecast 0.8 SET/year: 0.1 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~173 days; expected demand during lead time 0.8 (incl. 0.7 planned).
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 3 exceeds the level to keep (0) by 3.
Convert to Non StockSingle sourceOpen POPlanned demand in lead time
On hand / on order
3 / 1
next delivery 29 Dec 2026
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 110.4M
PO history
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 330,077/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~71 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-264A
TURBINE FOR KC-264A
S142.39

Lead time and procurement

Lead time 173 ± 65 days (PO history + category, 1 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
03 May 2026PR04
Regular (other)
1Rp 110.4M29 Dec 2026
open
240 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
11 Jun 2026LowPX_KT-264ALeak from packing
21 Apr 2026LowPX_KT-264AFollow up after steam upset KT-264A
21 Oct 2025MediumPX_KT-264AKT-264A governor valve hunting
31 May 2025MediumPX_KT-264AInstall scaffolding at KT-264A

Recent goods issues

Never issued in the 17-month history.