SEAL,LABYRINTH,DWG.643-8357,FOR KT-264A
Material 4300018169 · SEAL · Plant 1000
SReduceNon-moving
- Material
- 4300018169
- Category
- SEAL
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- PERMATA INSTRUMEN MAKMUR PT
- Lead time
- 173 d · P80 213 d
- Unit price
- Rp 110.4M
Recommendation
- 1.Forecast 0.8 SET/year: 0.1 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
- 2.Lead time ~173 days; expected demand during lead time 0.8 (incl. 0.7 planned).
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 3 exceeds the level to keep (0) by 3.
Convert to Non StockSingle sourceOpen POPlanned demand in lead time
On hand / on order
3 / 1
next delivery 29 Dec 2026
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 110.4M
PO history
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 330,077/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~71 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-264A TURBINE FOR KC-264A | S | 1 | 4 | 2.39 |
Lead time and procurement
Lead time 173 ± 65 days (PO history + category, 1 PO lines) · on-time 40%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 03 May 2026 | PR04 Regular (other) | 1 | Rp 110.4M | 29 Dec 2026 open | 240 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 26 Dec 2026 | PX_KT-264A | Turbine major overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 11 Jun 2026 | Low | PX_KT-264A | Leak from packing |
| 21 Apr 2026 | Low | PX_KT-264A | Follow up after steam upset KT-264A |
| 21 Oct 2025 | Medium | PX_KT-264A | KT-264A governor valve hunting |
| 31 May 2025 | Medium | PX_KT-264A | Install scaffolding at KT-264A |
Recent goods issues
Never issued in the 17-month history.