Sparely
DU

SPRING,SAFETY VALVE,DWG.241-9369,FOR PRV

Material 4300018516 · SPRING · Plant 1000

ASafety-criticalLong-leadReorderNormalSlow-moving
Material
4300018516
Category
SPRING
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
BUANA INDUSTRI LESTARI PT
Lead time
131 d · P80 196 d
Unit price
Rp 6.3M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~131 days; expected demand during lead time 0.1.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 5.On hand 2 + on order 0 is at or below the reorder point: order 1 now.
  • 6.Long lead time: 80% of deliveries took up to 196 days and the fastest seen in its category 77 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 6.3M · order by 01 Oct 2026
Expected arrival ≈ 131 days
Safety-critical (SCE)Long-leadSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 6.3M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 304 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 497.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~77 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_PRV-1236A
SAFETY VALVE HE-621
A120.47

Lead time and procurement

Lead time 131 ± 65 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
06 Jan 2026PR03
Regular replenishment
2Rp 6.3M25 Apr 2026109 d
30 Nov 2025PR03
Regular replenishment
2Rp 6.2M16 Apr 2026137 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Dec 2025LowPY_PRV-1236AReplace lamp as per PM finding
21 May 2025MediumPY_PRV-1236ALeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
01 Dec 20251201000036725Corrective