BEARING,JOURNAL,DWG.467-6837,FOR KC-886D

Material 4300020535 · BEARING · Plant 1000

BLong-leadReorderCriticalStockout
Material
4300020535
Category
BEARING
Base unit
SET
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
GEMILANG REFRAKTORI JAYA PT
Lead time
75 d · P80 127 d
Unit price
Rp 158.4M

Recommendation

  • 1.Forecast 1.6 SET/year: 1.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~75 days; expected demand during lead time 0.3.
  • 3.A 84.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 316.7M · order by 01 Oct 2026
Expected arrival ≈ 75 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
84.5%
stockout risk now 15%
Unit price
Rp 158.4M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 72 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 101.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~23 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-886D
BOTTOM FAN
B141.43

Lead time and procurement

Lead time 75 ± 40 days (PO history + category, 1 PO lines) · on-time 20%

PR dateTypeQtyUnit priceDeliveryLead time
22 May 2025PR06
Regular replenishment
1Rp 158.4M03 Oct 2025134 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Sept 2026LowPX_KC-886DKC-886D high vibration
10 Jul 2026MediumPX_KC-886DInstall scaffolding at KC-886D
20 Apr 2026LowPX_KC-886DReplace lamp as per PM finding
04 May 2025MediumPX_KC-886D[MSI-B-25-PZW-222/M] Replace line

Recent goods issues

Posting dateQtyOrderOrder type
21 Jul 20262201000011349Corrective