BEARING,JOURNAL,DWG.467-6837,FOR KC-886D
Material 4300020535 · BEARING · Plant 1000
BLong-leadReorderCriticalStockout
- Material
- 4300020535
- Category
- BEARING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- GEMILANG REFRAKTORI JAYA PT
- Lead time
- 75 d · P80 127 d
- Unit price
- Rp 158.4M
Recommendation
- 1.Forecast 1.6 SET/year: 1.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~75 days; expected demand during lead time 0.3.
- 3.A 84.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
- 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 316.7M · order by 01 Oct 2026
Expected arrival ≈ 75 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
84.5%
stockout risk now 15%
Unit price
Rp 158.4M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 72 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 101.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~23 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-886D BOTTOM FAN | B | 1 | 4 | 1.43 |
Lead time and procurement
Lead time 75 ± 40 days (PO history + category, 1 PO lines) · on-time 20%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 22 May 2025 | PR06 Regular replenishment | 1 | Rp 158.4M | 03 Oct 2025 | 134 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Sept 2026 | Low | PX_KC-886D | KC-886D high vibration |
| 10 Jul 2026 | Medium | PX_KC-886D | Install scaffolding at KC-886D |
| 20 Apr 2026 | Low | PX_KC-886D | Replace lamp as per PM finding |
| 04 May 2025 | Medium | PX_KC-886D | [MSI-B-25-PZW-222/M] Replace line |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 21 Jul 2026 | 2 | 201000011349 | Corrective |