POSITIONER,VALVE,DWG.740-3896,FOR TCV-16

Material 4300020691 · POSITIONER · Plant 1000

CMonitorSlow-moving
Material
4300020691
Category
POSITIONER
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
KANTO VALVE SYSTEMS KK
Lead time
87 d · P80 166 d
Unit price
Rp 15.7M

Recommendation

  • 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~87 days; expected demand during lead time 0.1.
  • 3.A 94.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
Single sourceOpen PO
On hand / on order
2 / 1
next delivery 02 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
94.5%
stockout risk now 0%
Unit price
Rp 15.7M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 256 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~40 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_TCV-162
PP-135A TEMP CONTROL
C100.12

Lead time and procurement

Lead time 87 ± 64 days (PO history + category, 2 PO lines) · on-time 29%

PR dateTypeQtyUnit priceDeliveryLead time
14 Aug 2026PR03
Regular replenishment
1Rp 15.6M02 Oct 2026
open
49 d
26 Jan 2026PR06
Regular replenishment
1Rp 15.8M07 May 2026101 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
18 Jan 20262201000012370Corrective