THERMOWELL,DWG.333-6500,FOR TEL-509A
Material 4300021032 · THERMOWELL · Plant 1000
BReorderCriticalStockout
- Material
- 4300021032
- Category
- THERMOWELL
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 78 d · P80 140 d
- Unit price
- Rp 6.1M (est.)
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~78 days; expected demand during lead time 0.1.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 12.1M · order by 01 Oct 2026
Expected arrival ≈ 78 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 5%
Unit price
Rp 6.1M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 419 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 53.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~43 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TEL-509A VD-1479 OUTLET | B | 1 | 2 | 0.44 |
Lead time and procurement
Lead time 78 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 08 Oct 2025 | Emergency | PX_TEL-509A | Install scaffolding at TEL-509A |
| 24 Jul 2025 | Low | PX_TEL-509A | Inspection TEL-509A.ok |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 Aug 2025 | 1 | 201000002258 | Corrective |