BEARING,THRUST PAD,DWG.520-6840,FOR KC-1

Material 4300021251 · BEARING · Plant 1000

ALong-leadReduceSlow-moving
Material
4300021251
Category
BEARING
Base unit
SET
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
GEMILANG REFRAKTORI JAYA PT
Lead time
96 d · P80 127 d
Unit price
Rp 62.7M

Recommendation

  • 1.Forecast 0.0 SET/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~96 days; expected demand during lead time 0.0.
  • 3.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 6 exceeds the level to keep (1) by 5.
  • 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadLast turnaround used 1Single sourceOpen PO
On hand / on order
6 / 1
next delivery 16 Jan 2027
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.4%
stockout risk now 0%
Unit price
Rp 62.7M
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 11.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-155D
CAUSTIC BLOWER
A100.57

Lead time and procurement

Lead time 96 ± 40 days (PO history + category, 2 PO lines) · on-time 20%

PR dateTypeQtyUnit priceDeliveryLead time
18 Aug 2026PR03
Regular replenishment
1Rp 61.3M16 Jan 2027
open
151 d
28 May 2025PR03
Regular replenishment
2Rp 64.1M08 Nov 2025164 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
18 Jan 20261203000029956Turnaround