POSITIONER,VALVE,DWG.696-2582,FOR FCV-20
Material 4300021294 · POSITIONER · Plant 1000
SMonitorNo stock needed
- Material
- 4300021294
- Category
- POSITIONER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- SURYA PERKASA SENTOSA PT
- Lead time
- 147 d · P80 242 d
- Unit price
- Rp 23.0M
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~147 days; expected demand during lead time 0.1.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Single sourceOpen PO
On hand / on order
0 / 2
next delivery 27 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 23.0M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 393 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 386,492/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~40 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-205B ETHYLENE FLOW CONTROL | S | 1 | 0 | 0.11 |
Lead time and procurement
Lead time 147 ± 76 days (PO history, 3 PO lines) · on-time 25%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 11 Aug 2026 | PR06 Regular replenishment | 2 | Rp 21.8M | 27 Dec 2026 open | 138 d |
| 11 Oct 2025 | PR03 Regular replenishment | 2 | Rp 23.4M | 16 Mar 2026 | 156 d |
| 28 Jul 2025 | PR03 Regular replenishment | 1 | Rp 23.0M | 24 May 2026 | 300 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 03 Sept 2025 | 1 | 201000035377 | Corrective |