Sparely
DU

BEARING,JOURNAL,DWG.613-4754,FOR KT-856A

Material 4300022803 · BEARING · Plant 1000

ALong-leadReduceNon-moving
Material
4300022803
Category
BEARING
Base unit
SET
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
NIPPON ROTARY PARTS CO LTD
Lead time
157 d · P80 127 d
Unit price
Rp 101.7M

Recommendation

  • 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~157 days; expected demand during lead time 0.0.
  • 3.A 95.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 59 exceeds the level to keep (1) by 58.
  • 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
59 / 2
next delivery 26 May 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
95.2%
stockout risk now 0%
Unit price
Rp 101.7M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 56.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 1 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A372.81

Lead time and procurement

Lead time 157 ± 40 days (PO history + category, 2 PO lines) · on-time 25%

PR dateTypeQtyUnit priceDeliveryLead time
29 Aug 2026PR03
Regular replenishment
1Rp 102.8M24 Jul 2027
open
329 d
06 Aug 2026PR03
Regular replenishment
1Rp 100.7M26 May 2027
open
293 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
26 Mar 2026MediumPX_KT-856AKT-856A steam leak at gland
20 Nov 2025MediumPX_KT-856AKT-856A governor valve hunting
16 Nov 2025LowPX_KT-856AInstall scaffolding at KT-856A
04 Sept 2025LowPX_KT-856AInstall scaffolding at KT-856A
26 Aug 2025LowPX_KT-856AReplace lamp as per PM finding
09 May 2025MediumPX_KT-856APSM25/KT-856A steam leak at gland

Recent goods issues

Never issued in the 17-month history.