Sparely
DU

VALVE,GOVERNOR,DWG.190-8989,FOR KT-856A

Material 4300023209 · VALVE · Plant 1000

AMonitorInsurance gap
Material
4300023209
Category
VALVE
Base unit
ASS
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
47 d · P80 92 d
Unit price
Rp 238.3M (est.)

Recommendation

  • 1.Forecast 0.1 ASS/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~47 days; expected demand during lead time 0.0.
  • 3.A 98.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
98.5%
stockout risk now 1%
Unit price
Rp 238.3M
Category + unit estimate
ML early warning: 0% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 49.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81

Lead time and procurement

Lead time 47 ± 30 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
26 Mar 2026MediumPX_KT-856AKT-856A steam leak at gland
20 Nov 2025MediumPX_KT-856AKT-856A governor valve hunting
16 Nov 2025LowPX_KT-856AInstall scaffolding at KT-856A
04 Sept 2025LowPX_KT-856AInstall scaffolding at KT-856A
26 Aug 2025LowPX_KT-856AReplace lamp as per PM finding
09 May 2025MediumPX_KT-856APSM25/KT-856A steam leak at gland

Recent goods issues

Never issued in the 17-month history.