BEARING,JOURNAL,DWG.466-6546,FOR KT-856A
Material 4300023527 · BEARING · Plant 1000
AReduceExcess
- Material
- 4300023527
- Category
- BEARING
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- CAHAYA TEKNIK NUSANTARA PT
- Lead time
- 55 d · P80 127 d
- Unit price
- Rp 166.1M
Recommendation
- 1.Forecast 1.3 SET/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~55 days; expected demand during lead time 0.2.
- 3.A 98.2% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Stock 3 exceeds the level to keep (2) by 1.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Single sourceOpen POLead time estimated
On hand / on order
3 / 2
next delivery 22 Dec 2026
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
98.2%
stockout risk now 0%
Unit price
Rp 166.1M
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 2 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 661.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-856A TURBINE FOR KC-856A | A | 1 | 7 | 2.81 |
Lead time and procurement
Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time 50%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 29 Nov 2025 | PR01 Import / long-lead | 2 | Rp 166.1M | 22 Dec 2026 open | 388 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 20 Jul 2026 | Low | PX_KT-856A | Follow up after steam upset KT-856A |
| 26 Mar 2026 | Medium | PX_KT-856A | KT-856A steam leak at gland |
| 20 Nov 2025 | Medium | PX_KT-856A | KT-856A governor valve hunting |
| 16 Nov 2025 | Low | PX_KT-856A | Install scaffolding at KT-856A |
| 04 Sept 2025 | Low | PX_KT-856A | Install scaffolding at KT-856A |
| 26 Aug 2025 | Low | PX_KT-856A | Replace lamp as per PM finding |
| 09 May 2025 | Medium | PX_KT-856A | PSM25/KT-856A steam leak at gland |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 29 Sept 2026 | 1 | 201000002157 | Corrective |