TRIM SET,CONTROL VALVE,DWG.946-1608,FOR

Material 4300023747 · TRIM SET · Plant 1000

CMonitorNo stock needed
Material
4300023747
Category
TRIM SET
Base unit
SET
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
BERKAH REFRAKTORI PRATAMA PT
Lead time
199 d · P80 236 d
Unit price
Rp 111.0M

Recommendation

  • 1.Forecast 0.3 SET/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~199 days; expected demand during lead time 0.2.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Single sourceOpen PO
On hand / on order
0 / 2
next delivery 25 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 111.0M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 304 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 10.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~75 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-465
PP-1029C OUTLET FLOW
C120.54

Lead time and procurement

Lead time 199 ± 83 days (PO history + category, 2 PO lines) · on-time 43%

PR dateTypeQtyUnit priceDeliveryLead time
27 Jul 2026PR06
Regular replenishment
1Rp 106.1M08 Jun 2027
open
316 d
09 Oct 2025PR06
Regular replenishment
1Rp 114.6M25 Oct 2026
open
381 d
20 Aug 2025PR06
Regular replenishment
2Rp 111.0M09 Mar 2026201 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 Oct 2025MediumPX_FCV-465Painting FCV-465
27 Jul 2025MediumPX_FCV-465Overhaul FCV-465

Recent goods issues

Posting dateQtyOrderOrder type
01 Dec 20251201000016457Corrective