IMPELLER,DWG.183-8438,FOR PP-1540

Material 4300023958 · IMPELLER · Plant 1000

BLong-leadMonitorSlow-moving
Material
4300023958
Category
IMPELLER
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
DUTA ENERGI ABADI PT
Lead time
195 d · P80 260 d
Unit price
Rp 36.2M

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~195 days; expected demand during lead time 0.1.
  • 3.A 99.1% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Long lead time: 80% of deliveries took up to 260 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
1 / 3
next delivery 12 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.1%
stockout risk now 0%
Unit price
Rp 36.2M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 251 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 146.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~105 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1540
FUEL OIL PUMP
B110.19

Lead time and procurement

Lead time 195 ± 97 days (PO history, 3 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
27 Jun 2026PR01
Import / long-lead
1Rp 36.4M02 Mar 2028
open
614 d
18 Jan 2026PR03
Regular replenishment
1Rp 36.5M12 Dec 2026
open
328 d
07 Dec 2025PR01
Import / long-lead
1Rp 36.2M19 May 2027
open
528 d
23 Oct 2025PR06
Regular replenishment
1Rp 35.5M02 Mar 2026130 d
14 Oct 2025PR06
Regular replenishment
2Rp 35.5M20 Mar 2026157 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
02 May 2025MediumPX_PP-1540Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
23 Jan 20261201000025721Corrective