IMPELLER,DWG.183-8438,FOR PP-1540
Material 4300023958 · IMPELLER · Plant 1000
BLong-leadMonitorSlow-moving
- Material
- 4300023958
- Category
- IMPELLER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- DUTA ENERGI ABADI PT
- Lead time
- 195 d · P80 260 d
- Unit price
- Rp 36.2M
Recommendation
- 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~195 days; expected demand during lead time 0.1.
- 3.A 99.1% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Long lead time: 80% of deliveries took up to 260 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
1 / 3
next delivery 12 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.1%
stockout risk now 0%
Unit price
Rp 36.2M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 251 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 146.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~105 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1540 FUEL OIL PUMP | B | 1 | 1 | 0.19 |
Lead time and procurement
Lead time 195 ± 97 days (PO history, 3 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 27 Jun 2026 | PR01 Import / long-lead | 1 | Rp 36.4M | 02 Mar 2028 open | 614 d |
| 18 Jan 2026 | PR03 Regular replenishment | 1 | Rp 36.5M | 12 Dec 2026 open | 328 d |
| 07 Dec 2025 | PR01 Import / long-lead | 1 | Rp 36.2M | 19 May 2027 open | 528 d |
| 23 Oct 2025 | PR06 Regular replenishment | 1 | Rp 35.5M | 02 Mar 2026 | 130 d |
| 14 Oct 2025 | PR06 Regular replenishment | 2 | Rp 35.5M | 20 Mar 2026 | 157 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 02 May 2025 | Medium | PX_PP-1540 | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 23 Jan 2026 | 1 | 201000025721 | Corrective |