POSITIONER,VALVE,DWG.900-4926,FOR LCV-26

Material 4300024044 · POSITIONER · Plant 1000

BLong-leadReorderCriticalStockout
Material
4300024044
Category
POSITIONER
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
115 d · P80 166 d
Unit price
Rp 47.9M

Recommendation

  • 1.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~115 days; expected demand during lead time 0.2.
  • 3.A 97.7% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Long lead time: 80% of deliveries took up to 166 days and the fastest seen in its category 40 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 95.8M · order by 01 Oct 2026
Expected arrival ≈ 115 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
97.7%
stockout risk now 21%
Unit price
Rp 47.9M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 473 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 158.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~40 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-260
VD-1714 LEVEL CONTROL
B162.26

Lead time and procurement

Lead time 115 ± 64 days (PO history + category, 1 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
31 May 2025PR03
Regular replenishment
2Rp 47.9M23 Nov 2025176 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
13 Jul 2026MediumPX_LCV-260Leak from packing
26 Mar 2026MediumPX_LCV-260LCV-260 passing
30 Jan 2026MediumPX_LCV-260LCV-260; IA leak from regulator
16 Nov 2025EmergencyPX_LCV-260Replace lamp as per PM finding
26 Oct 2025LowPX_LCV-260LCV-260 passing
26 May 2025LowPX_LCV-260PSM25/Install scaffolding at LCV-260

Recent goods issues

Posting dateQtyOrderOrder type
15 Jun 20251201000004027Corrective