POSITIONER,VALVE,DWG.900-4926,FOR LCV-26
Material 4300024044 · POSITIONER · Plant 1000
BLong-leadReorderCriticalStockout
- Material
- 4300024044
- Category
- POSITIONER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- PERMATA INSTRUMEN INTERNASIONAL PT
- Lead time
- 115 d · P80 166 d
- Unit price
- Rp 47.9M
Recommendation
- 1.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~115 days; expected demand during lead time 0.2.
- 3.A 97.7% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
- 5.Long lead time: 80% of deliveries took up to 166 days and the fastest seen in its category 40 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 95.8M · order by 01 Oct 2026
Expected arrival ≈ 115 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
97.7%
stockout risk now 21%
Unit price
Rp 47.9M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 473 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 158.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~40 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LCV-260 VD-1714 LEVEL CONTROL | B | 1 | 6 | 2.26 |
Lead time and procurement
Lead time 115 ± 64 days (PO history + category, 1 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 31 May 2025 | PR03 Regular replenishment | 2 | Rp 47.9M | 23 Nov 2025 | 176 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 13 Jul 2026 | Medium | PX_LCV-260 | Leak from packing |
| 26 Mar 2026 | Medium | PX_LCV-260 | LCV-260 passing |
| 30 Jan 2026 | Medium | PX_LCV-260 | LCV-260; IA leak from regulator |
| 16 Nov 2025 | Emergency | PX_LCV-260 | Replace lamp as per PM finding |
| 26 Oct 2025 | Low | PX_LCV-260 | LCV-260 passing |
| 26 May 2025 | Low | PX_LCV-260 | PSM25/Install scaffolding at LCV-260 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 15 Jun 2025 | 1 | 201000004027 | Corrective |