COUPLING,DWG.303-2938,FOR PP-1577D

Material 4300024294 · COUPLING · Plant 1000

BLong-leadMonitorSlow-moving
Material
4300024294
Category
COUPLING
Base unit
SET
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
MEGA MANDIRI PERSADA PT
Lead time
81 d · P80 139 d
Unit price
Rp 2.8M

Recommendation

  • 1.Forecast 0.5 SET/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~81 days; expected demand during lead time 0.1.
  • 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Long lead time: 80% of deliveries took up to 139 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
2 / 1
next delivery 06 Nov 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.5%
stockout risk now 0%
Unit price
Rp 2.8M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 305 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 109.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~44 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1577D
ETHYLENE PUMP
B121.05

Lead time and procurement

Lead time 81 ± 54 days (PO history + category, 1 PO lines) · on-time 75%

PR dateTypeQtyUnit priceDeliveryLead time
03 Sept 2026PR03
Regular replenishment
1Rp 2.8M06 Nov 2026
open
64 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Sept 2026MediumPX_PP-1577DReplace bearing PP-1577D
29 Aug 2025MediumPX_PP-1577DReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
30 Nov 20251201000005000Corrective